Most renovation work on a Philadelphia house needs a permit from the Department of Licenses & Inspections (L&I). On a renovation loan, permits do more than keep you compliant with the city. Your contractor's draws often can't be released without them. Here's how the two fit together.
Why your lender cares about permits
On a 203k or HomeStyle loan, renovation money sits in an escrow and is released in draws as work is completed and inspected. Permitted work has to be permitted before it's paid for, and the final draw usually depends on the work passing city inspection.
That makes the permit timeline part of the loan timeline. A contractor who starts work, or asks for a draw, before the permit is issued is creating a problem for you.
EZ permits: the fast lane for common work
Philadelphia offers EZ permits for routine projects. They don't require you to submit plans. According to the city, EZ permits cover work including:
- non-structural interior alterations in a single-family home
- removing non-load-bearing interior walls
- replacing windows and doors without changing the opening size
- replacing roof coverings and wall coverings
- replacing a non-historic masonry facade
- residential decks up to 216 square feet (not roof decks)
- electrical, plumbing, mechanical and fire suppression work
A lot of 203k Limited and smaller HomeStyle scopes fall almost entirely inside that list: new kitchen, new bath, windows, roof covering, new mechanicals.
Applications go through the city's eCLIPSE online system or in person at the Permit and License Center, which requires an appointment. The work has to meet the city's EZ standards. If it doesn't, the permit can be revoked.
When you need plans
Structural work, changes to load-bearing walls, additions, roof decks, changes of use, and anything outside the EZ list generally need a full building permit with plans. That means a design professional, plan review, and more time.
On a 203k Standard or a larger HomeStyle, build plan review into the schedule. The renovation clock on your loan starts at closing, not when the city approves the plans. The most common reason a Philadelphia renovation loan runs long is a scope that needed plans being treated as if it didn't.
Who is allowed to do the work
This is where buyers get caught. The city's rules for EZ-permitted work say it has to be done by:
- a licensed Philadelphia contractor, or
- for an existing one- or two-family home, the owner living in the building, or a registered Pennsylvania Home Improvement Contractor who also holds a Philadelphia Commercial Activity License.
Electrical, plumbing, fire suppression and sheet metal work always require a contractor licensed for that specific trade.
The contractor has to be named on the permit and be in good standing with the city: active license, current on city taxes, and insurance on file with L&I. Before you sign a contractor for a renovation loan, check all three. Our guide to finding a 203k contractor in Philadelphia covers the rest of the vetting.
Historic properties
If the house is on the Philadelphia Register of Historic Places or in a historic district, exterior work generally needs Historical Commission review. That covers windows, doors, masonry and rooflines. Interior work usually doesn't. We cover this in detail in renovating in a Philadelphia historic district.
Buying a house with open violations
Houses that come with open L&I violations are common in the sales we finance, and a renovation loan is often the best way to buy one. The violations become part of the scope. How that works is in buying a house with L&I violations.
The short version
- Permitted work needs the permit before it's paid for, and final draws usually wait on city inspection.
- EZ permits cover many common renovation items without plans. Apply through eCLIPSE.
- Structural work and additions need full plans. Build plan review into your loan timeline.
- In most cases the work must be done by a licensed Philadelphia contractor, and the trades always need trade-licensed contractors.
- Exterior work on a historic property needs Historical Commission review.
Permit rules change. Confirm current requirements with Philadelphia L&I before you finalize a scope.
Plan the permits into the loan
We review your contractor's scope before closing and flag permit-heavy items early, so the escrow, the draw schedule and the city's timeline line up.
Get Pre-Qualified Free · Free consultation
Jeff Onofrio, SVP of Renovation Lending, NMLS #38670 · HMA Mortgage, NMLS #139164 · Equal Housing Lender. Not a commitment to lend. This page is general information, not legal advice.